ID Project : 103441

Construction of Reservoirs of HASSAN ABAD

Construction of 2000 cubic meter reservoir of Qaleh Hassan, transmission line from Shahid Kalantari reservoir to 2000 cubic meter reservoir and pumping station

Technical office

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project Description :

Construction of 2000 cubic meters of concrete tank in external dimensions of about 22 by 32 and height of 6 meters, construction of pump house and construction of electric building and substation chamber, construction of transmission line from Shahid Kalantari reservoirs to Qala Hassan reservoir with ductile cast iron pipe, construction of electrical installations of pump station structures, guard and tank enclosure.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

4.8/5

Studies of SARMAST Wastewater

4.2/5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

5/5

YAZD Water Supply

4.8/5

City of SARPOLEZAHAB Wastewater studies

4/5

University of BOJNOURD

4.5/5

Building of the Laboratories of University Of BOJNORD

5/5

SARMAST Wastewater Supervision

4.5/5

ZHAVE Dam Water Transmission System

4.2/5

Financing the Sewage Facilities of Six Cities (Dezful City)

4/5

MEIMEH Irrigation and Drainage Network

4.5/5

Effluent Transmission System

4.7/5

Drinking Water Supply of BOJNORD