Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

ID Project : 103401

Industrial FARAMAN Town Wastewater

Feasibility studies and design of the sewage transmission line of the third phase of Faraman industrial town to the central treatment plant

Engineering econom

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first phase studies include: all services and survey, field visits to electrical installations, performing design calculations of the pumping station, effluent transmission line
The second phase studies include: performing hydraulic and structural calculations, preparing executive plans, designing all electrical installations and power posts and panels, preparing and arranging tender documents.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

Rated 4.5 out of 5

Villages of SISTAN and BALUCHESTAN Province

Rated 4 out of 5

MEIMEH Irrigation and Drainage Network

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Bostan City)

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Dezful City)

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Shoush City)

Rated 5 out of 5

SARMAST Wastewater Supervision

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Shadegan City)

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Mahshahr Seaport)

Rated 4 out of 5

Wastewater Systems Telemetry

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Khorramshahr City)

Rated 5 out of 5

Environmental Feasibility Report