Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103441

Construction of Reservoirs of HASSAN ABAD

Construction of 2000 cubic meter reservoir of Qaleh Hassan, transmission line from Shahid Kalantari reservoir to 2000 cubic meter reservoir and pumping station

Technical office

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project Description :

Construction of 2000 cubic meters of concrete tank in external dimensions of about 22 by 32 and height of 6 meters, construction of pump house and construction of electric building and substation chamber, construction of transmission line from Shahid Kalantari reservoirs to Qala Hassan reservoir with ductile cast iron pipe, construction of electrical installations of pump station structures, guard and tank enclosure.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

4.8/5

Studies of SARMAST Wastewater

5/5

Drinking Water Supply to DAVOUDABAD City

3.8/5

DORISAN, CHOREZHY, NOSME & SARKARAN

4.8/5

City of SARPOLEZAHAB Wastewater studies

4.5/5

Islamic Azad University of SAFADASHT

4.2/5

Financing the Sewage Facilities of Six Cities (Dasht Azadegan)

4.5/5

ZHAVE Dam Water Transmission System

4/5

University of BOJNOURD

4.7/5

Drinking Water Supply of BOJNORD

4.5/5

PARDIS Water and Wastewater

4.2/5

Financing the Sewage Facilities of Six Cities (Bostan City)

5/5

City of SARPOLEZOHAB Wastewater Supervision