Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103401

Industrial FARAMAN Town Wastewater

Feasibility studies and design of the sewage transmission line of the third phase of Faraman industrial town to the central treatment plant

Engineering econom

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first phase studies include: all services and survey, field visits to electrical installations, performing design calculations of the pumping station, effluent transmission line
The second phase studies include: performing hydraulic and structural calculations, preparing executive plans, designing all electrical installations and power posts and panels, preparing and arranging tender documents.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

5/5

SHIRVAN Wastewater Treatment Plant

4.8/5

City of SARPOLEZAHAB Wastewater studies

3.8/5

DORISAN, CHOREZHY, NOSME & SARKARAN

4.5/5

ZHAVE Dam Water Transmission System

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Mahshahr Seaport)

5/5

Environmental Feasibility Report

4.5/5

PARDIS Water and Wastewater

4.2/5

Financing the Sewage Facilities of Six Cities (Shoush City)

4.7/5

Drinking Water Supply of BOJNORD

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Shadegan City)

4.5/5

AZAD Dam Irrigation and Drainage Network

4.7/5

Industrial FARAMAN Town Wastewater