Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103458

City of SARPOLEZAHAB Wastewater studies

Studies of the first and second stages of wastewater collection network and transmission in Zafaran village, Sarpol-e Zahab city

Technical office

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first phase studies include: surveys, studies, research and experiments necessary for preliminary design and preparation of preliminary maps
The studies of the second phase include: detailed and executive reports and plans, as well as the preparation of all documents of the execution of the project, including technical specifications, goods estimation and cost estimation.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

4.5/5

Islamic Azad University of SAFADASHT

4.5/5

Effluent Transmission System

4.2/5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

5/5

SHIRVAN Wastewater Treatment Plant

4.5/5

PARDIS Water and Wastewater

5/5

Drinking Water Supply to DAVOUDABAD City

4.2/5

Financing the Sewage Facilities of Six Cities (Bostan City)

5/5

Pumping Stations Rehabilitation

4.5/5

ZHAVE Dam Water Transmission System

4.7/5

NASERABAD and ZAGHEH villages Wastewater

4/5

Wastewater Systems Telemetry

4.8/5

City of SARPOLEZAHAB Wastewater studies