ID Project : 103412

Studies of SARMAST Wastewater

The first and second phase studies of Sarmast city sewage collection network

Study First phase

Study Second Phase

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

Quantitative and qualitative characteristics of wastewater Investigation of types of pipes and their accessories, Basic studies and foundations of collection network and sewage transmission line, collection system and sewage transmission line of Sarmast city

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

5/5

YAZD Water Supply

4.5/5

AZAD Dam Irrigation and Drainage Network

4.2/5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Mahshahr Seaport)

4.5/5

ZHAVE Dam Water Transmission System

4/5

MEIMEH Irrigation and Drainage Network

5/5

SHIRVAN Wastewater Treatment Plant

4.5/5

PARDIS Water and Wastewater

5/5

Drinking Water Supply to DAVOUDABAD City

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Khorramshahr City)

4/5

Wastewater Systems Telemetry

4.7/5

Industrial FARAMAN Town Wastewater