Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

ID Project : 103458

City of SARPOLEZAHAB Wastewater studies

Studies of the first and second stages of wastewater collection network and transmission in Zafaran village, Sarpol-e Zahab city

Technical office

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first phase studies include: surveys, studies, research and experiments necessary for preliminary design and preparation of preliminary maps
The studies of the second phase include: detailed and executive reports and plans, as well as the preparation of all documents of the execution of the project, including technical specifications, goods estimation and cost estimation.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

Rated 5 out of 5

Pumping Stations Rehabilitation

Rated 5 out of 5

YAZD Water Supply

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Dasht Azadegan)

Rated 5 out of 5

Drinking Water Supply to DAVOUDABAD City

Rated 5 out of 5

SARMAST Wastewater Supervision

Rated 4.7 out of 5

Drinking Water Supply of BOJNORD

Rated 4.5 out of 5

Islamic Azad University of SAFADASHT

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Shadegan City)

Rated 4 out of 5

MEIMEH Irrigation and Drainage Network

Rated 4.5 out of 5

Villages of SISTAN and BALUCHESTAN Province

Rated 5 out of 5

Environmental Feasibility Report

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Andimeshk City)