Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

ID Project : 103094

Effluent Transmission System

Financing, design, procurement, construction, operation and maintenance of pumping station and effluent transmission line of Karaj wastewater treatment plant (Mahdasht) to Eshtehard industrial towns, Kowsar, Mahdasht and other limited industries. Secondary waswwater treatment plant (if needed) and transfer to investable

Study First phase

Study Second Phase

Supervision

Public private par

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Project Progress Percent 80%

Project images :

Click on One of the Photos to Enlarge

Project Description :

Consultant responsibilities include: supply of power for workshop supervision and superior supervision, supply of design experts to review and modify previous plans, project manager and control expert, and electrical and mechanical experts

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

Rated 4.5 out of 5

ZHAVE Dam Water Transmission System

Rated 4.5 out of 5

PARDIS Water and Wastewater

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Dezful City)

Rated 5 out of 5

YAZD Water Supply

Rated 4.5 out of 5

Effluent Transmission System

Rated 4.2 out of 5

Construction of Reservoirs of HASSAN ABAD

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

Rated 3.8 out of 5

DORISAN, CHOREZHY, NOSME & SARKARAN

Rated 4 out of 5

Wastewater Systems Telemetry

Rated 5 out of 5

Pumping Stations Rehabilitation

Rated 4.5 out of 5

Ramhormoz Wastewater Treatment Plant Studies

Rated 4.5 out of 5

Construction of Drinking Water Supply to GORGAN City