Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103162

DORISAN, CHOREZHY, NOSME & SARKARAN

Studies of the first and second phases of the collection network and transmission line of dorisan-chorzhi-nesmeh-sarkran city of paveh

Study First Phase

Study Second Phase

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Project Progress Percent 25%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first stage studies include: data collection, review and evaluation, basic studies, technical criteria, preparation of preliminary design, safety and defense passive
The second stage studies include: planning, conducting studies and preparing equipment, performing technical calculations, preparing plans and executive details, preparing and arranging tender documents.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

4/5

University of BOJNOURD

4.8/5

City of SARPOLEZAHAB Wastewater studies

4.2/5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Shadegan City)

4.5/5

ZHAVE Dam Water Transmission System

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Khorramshahr City)

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (ABADAN City)

4/5

Wastewater Systems Telemetry

4.8/5

Studies of SARMAST Wastewater

4.5/5

Villages of SISTAN and BALUCHESTAN Province

4.5/5

Building of the Laboratories of University Of BOJNORD

4.5/5

AZAD Dam Irrigation and Drainage Network