Villages of SISTAN and BALUCHESTAN Province

Studies of the first and second stages of water supply in some villages, Saravan city

Study

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

the first phase studies include: surveys, studies, research and experiments necessary for preliminary design and preparation of preliminary maps
The studies of the second phase include: detailed and executive reports and plans, as well as the preparation of all documents of the execution of the project, including technical specifications, goods estimation and cost estimation.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

5/5

City of SARPOLEZOHAB Wastewater Supervision

5/5

SHIRVAN Wastewater Treatment Plant

4.2/5

Financing the Sewage Facilities of Six Cities (Dezful City)

5/5

Pumping Stations Rehabilitation

4.2/5

Financing the Sewage Facilities of Six Cities (Bostan City)

4.5/5

Construction of Drinking Water Supply to GORGAN City

4.2/5

Financing the Sewage Facilities of Six Cities (Shoush City)

4.7/5

NASERABAD and ZAGHEH villages Wastewater

4.7/5

Drinking Water Supply of BOJNORD

4/5

University of BOJNOURD

4.2/5

Financing the Sewage Facilities of Six Cities (Andimeshk City)

4.5/5

AZAD Dam Irrigation and Drainage Network