Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103143

Pumping Stations Rehabilitation

Upgrading, repairing and reconstructing the pumping station and water transmission line of the Tazehabad city (Salas Babajani) and Javanrood city – Tazehabad city water supply and Javanrood city water supply and (Shahid Nazari water treatment plant) of Kermanshah

Study First phase

Study Second phase

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Project Progress Percent 90%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first phase studies include preliminary regional studies, preparing the basics of the plan and presenting different options and comparing the proposed options in terms of technical, economic and ease of operation and introducing the superior option. The information of the second stage includes reviewing the basics of the superior option plan and detailed design including preparing plan and profile maps and all executive details.
Surveying includes surveying operations of transmission line routes and pumping urban and rural areas.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

4.5/5

Building of the Laboratories of University Of BOJNORD

4/5

MEIMEH Irrigation and Drainage Network

5/5

SARMAST Wastewater Supervision

4.7/5

Industrial FARAMAN Town Wastewater

4/5

Wastewater Systems Telemetry

5/5

Environmental Feasibility Report

4.5/5

ZHAVE Dam Water Transmission System

4.5/5

Ramhormoz Wastewater Treatment Plant Studies

5/5

SHIRVAN Wastewater Treatment Plant

5/5

Pumping Stations Rehabilitation

4.7/5

NASERABAD and ZAGHEH villages Wastewater

4.5/5

AZAD Dam Irrigation and Drainage Network