Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103162

DORISAN, CHOREZHY, NOSME & SARKARAN

Studies of the first and second phases of the collection network and transmission line of dorisan-chorzhi-nesmeh-sarkran city of paveh

Study First Phase

Study Second Phase

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Project Progress Percent 25%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first stage studies include: data collection, review and evaluation, basic studies, technical criteria, preparation of preliminary design, safety and defense passive
The second stage studies include: planning, conducting studies and preparing equipment, performing technical calculations, preparing plans and executive details, preparing and arranging tender documents.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

4.7/5

NASERABAD and ZAGHEH villages Wastewater

4/5

University of BOJNOURD

5/5

Environmental Feasibility Report

4.2/5

Financing the Sewage Facilities of Six Cities (Dasht Azadegan)

4.2/5

Financing the Sewage Facilities of Six Cities (Shoush City)

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (ABADAN City)

5/5

SARMAST Wastewater Supervision

4.5/5

Construction of Drinking Water Supply to GORGAN City

5/5

YAZD Water Supply

4/5

MEIMEH Irrigation and Drainage Network

5/5

City of SARPOLEZOHAB Wastewater Supervision

3.8/5

DORISAN, CHOREZHY, NOSME & SARKARAN