Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

Pakab Consulting Engineers

Design, Supervision and Management of Water and Sewage,
Survey and Environmental Projects

ID Project : 103412

Studies of SARMAST Wastewater

The first and second phase studies of Sarmast city sewage collection network

Study First phase

Study Second Phase

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

Quantitative and qualitative characteristics of wastewater Investigation of types of pipes and their accessories, Basic studies and foundations of collection network and sewage transmission line, collection system and sewage transmission line of Sarmast city

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

3.8/5

DORISAN, CHOREZHY, NOSME & SARKARAN

4.2/5

Construction of Reservoirs of HASSAN ABAD

4.5/5

AZAD Dam Irrigation and Drainage Network

4.5/5

PARDIS Water and Wastewater

5/5

Environmental Feasibility Report

4.2/5

Financing the Sewage Facilities of Six Cities (Dasht Azadegan)

4.8/5

Studies of SARMAST Wastewater

5/5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Imam Seaport)

4/5

MEIMEH Irrigation and Drainage Network

5/5

Pumping Stations Rehabilitation

4.5/5

Islamic Azad University of SAFADASHT

4.8/5

City of SARPOLEZAHAB Wastewater studies