Design, Supervision and Management of Water and Sewage, Survey and Environmental Projects

ID Project : 103393

NASERABAD and ZAGHEH villages Wastewater

Engineering services for the studies of the first and second stages of the wastewater treatment network of Nasserabad and Zagheh villages of Abyek city

Study First Phase

Study Second Phase

Progress Percent

Percentage of total project progress compared to percentages presented in different phases

Finished 100%

Project images :

Click on One of the Photos to Enlarge

Project Description :

The first stage studies include: data collection, review and evaluation _ Basic studies _ Technical criteria _ Preparation of preliminary design _ safety and defense passive
The second stage studies include: planning, conducting studies and preparing equipment, performing technical calculations, preparing plans and executive details, preparing and arranging tender documents.

Read More

Other Projects

You can see the flagship projects of pakab company below. Click on the relevant project to visit each of them

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Izeh City)

Rated 4.7 out of 5

Drinking Water Supply of BOJNORD

Rated 4 out of 5

University of BOJNOURD

Rated 4.5 out of 5

Construction of Drinking Water Supply to GORGAN City

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Shadegan City)

Rated 4.5 out of 5

Islamic Azad University of SAFADASHT

Rated 5 out of 5

Pumping Stations Rehabilitation

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Imam Seaport)

Rated 5 out of 5

Drinking Water Supply to DAVOUDABAD City

Rated 5 out of 5

Wastewater Treatment Plants of 5 first cities of KHOUZESTAN Provine (Khorramshahr City)

Rated 5 out of 5

City of SARPOLEZOHAB Wastewater Supervision

Rated 4.2 out of 5

Financing the Sewage Facilities of Six Cities (Andimeshk City)